Before the crew unpacks the indoor unit, walk them through the rooms with your signed quote. Read the model numbers on the cartons together. For a multi-zone job, match each indoor model to its intended room. Two heads can look alike and have different capacities. A mix-up takes minutes to catch while the cartons are still on the floor.

Before the first hole
Point out the sofa, bed, closet door or curtain rod that affected the choice of wall. Confirm where the indoor head, outdoor unit, line cover and drain outlet will go. Ask the lead installer to show you any changes from the drawing and explain their effect on price or access before proceeding. Agree on a time for the handover so the person who will use the system can be there.
If piping or a pump will disappear behind finished trim, ask the crew when you can photograph the route without getting in their way. A photo with a doorway or window in the frame is easier to locate later than a close-up of a bare wall.
What the startup record should tell you
Commissioning is the installer’s check that the finished system operates as designed. Ask for the startup record for your equipment. Look for the model numbers, date, technician and results of the manufacturer’s required checks. These can include refrigerant-line leak and evacuation checks, charge verification for the installed piping, drain testing and operation in the available modes. PNNL’s ductless installation guide describes the sequence. Leave the technical tests and electrical work to the crew.
If the weather puts a mode outside the manufacturer’s test conditions, ask the contractor to write down what was tested, what is deferred and who will arrange a return visit if needed. During the demonstration, identify which remote controls which head. Ask to see the fan, vane and mode settings and what to do when heat pumps on a shared outdoor unit receive conflicting commands.
Stand where you will actually use it
Sit in your usual chair while the crew adjusts the airflow. Have someone show you how to access the filters and where condensate drains in cooling mode. Before the truck leaves, gather the indoor and outdoor serial numbers, manuals, invoice, startup record and service contact. Confirm who handles any permit closeout or warranty registration that applies to your job. Save the documents and route photos together so the next technician can find them without opening a wall.
| At this point | What to leave with |
|---|---|
| Before drilling | A confirmed head, outdoor unit, cover and drain location. |
| Before the route is enclosed | A photo that shows its location in the room. |
| After startup | Test results and any outstanding seasonal check. |
| Before the crew leaves | Working controls, manuals, serial numbers and a service contact. |